Skip to content
Alpha Devraj ESS

Manufacturing

Where and how are Alpha Devraj ESS systems built?

At our fully automated, state-of-the-art facility in Gujarat with 5 GWh of annual manufacturing capacity: LFP cells are machine-graded and built into packs, packs are integrated into containers with cooling, fire suppression and power electronics, and every finished system passes factory acceptance testing before dispatch.

Gujarat
Manufacturing location
5 GWh
Annual manufacturing capacity
100%
Systems FAT-tested before dispatch
4
Quality gates, cell to container

Our philosophy

Quality first. Not as a slogan — as a sequence.

Every system we build ends up connected to a grid someone depends on — often our own. So quality is not a department that inspects at the end; it is the order in which we do everything.

01

Reject early

Cells are graded before they earn a place in a pack. The cheapest defect is the one that never enters the line.

02

Test everything

100% factory acceptance testing — full charge–discharge cycling on every unit. No sampling, no exceptions.

03

Stay accountable

Every system ships with its build record and stays on our 24×7 monitoring desk. Quality does not end at dispatch.

Audit us before you buy — factory visits and pre-shipment inspections welcome.

Schedule a visit

The line

Cell to container, one flow.

A fully automated line — robotic cell handling, laser welding, automated end-of-line testing — with four stages and a quality gate at each. A system only moves forward when the stage before it has passed.

Unit #03Moving down the line
01 · Cell intake & grading02 · Module & pack build03 · Container integration04 · Test & dispatch01020304ALPHA DEVRAJ
  1. 01

    Cell intake & grading

    Incoming LFP cells are inspected, capacity-tested, sorted and matched so every pack starts from a consistent baseline.

  2. 02

    Module & pack build

    Cells are assembled into modules and packs with welded interconnects, sensors and an integrated BMS — torque, polarity and insulation verified at each station.

  3. 03

    Container integration

    Packs, liquid-cooling loops, fire suppression, power electronics and cabling are integrated into the enclosure as one engineered system.

  4. 04

    Test & dispatch

    Full charge/discharge cycling, thermal and safety checks, and factory acceptance testing before the finished system ships to site.

Why we assemble in-house.

Storage projects live or die on delivered quality and lead time. Owning a state-of-the-art, fully automated line means we control both: cells our machines have graded, packs our line has built and tested, containers we have integrated — with no black boxes between us and the hardware we stand behind.

It also secures supply for our own pipeline. As a subsidiary of Alpha Devraj Renewable Energy, our systems go into projects we develop and operate ourselves — the strongest quality incentive a manufacturer can have.

Built to be audited.

Every pack and container carries its test record: cell grading data, torque logs, insulation results, cycling curves and factory acceptance reports. Lenders, insurers and EPC partners get documentation, not assurances.

Factory visits are welcome — talk to us to schedule one.

The facility

Built like the product depends on it. Because it does.

The fully automated, state-of-the-art line in Gujarat — 5 GWh of annual capacity — is designed around one principle: nothing ships that we would not connect to our own plants.

Precision cell testing

Every incoming cell is capacity-tested and internal-resistance-graded on precision battery analyzers before it earns a place in a pack — matched cells age together, unmatched cells fail together.

Cell-level traceability

Each pack carries its build record: cell batch and grading data, weld and torque logs, insulation results, cycling curves. Lenders and insurers get documentation, not assurances.

100% factory acceptance

Full charge–discharge cycling, thermal mapping and safety checks on every finished system — witnessed by the customer when they want to be in the room. No sampling. Every unit.

Engineered to: IEC 62619IEC 62933UL 9540AISO 9001ISO 14001 — status per standard stated in datasheets

Let's talk storage

Sourcing packs or containers?

We supply assembled packs and integrated containers to EPCs and developers — talk to us about volumes and timelines.