Another gigawatt-hour of Indian battery capacity in the pipeline, tracked alongside our tender coverage.
Fujiyama Ratlam lithium battery expansion
Added capacity
1 GWh/yr
Site
Ratlam
Status
Planned
A planned 1 GWh addition in Madhya Pradesh — announced capacity, not yet running, but another line aimed at India's local-content requirements.
pv magazine India ↗What it means
Read manufacturing headlines by their verb. This one is a plan, not an opening — capacity that has to be built and commissioned before it can be booked against orders, unlike lines already running such as Octillion’s third Indian plant. A gigawatt-hour a year is roughly the size of one large state storage award, so each addition of this scale moves the domestic supply position a little further from imports.
The commercial reason to track it is procurement rules: domestic content requirements in a growing share of Indian tenders make locally assembled packs a qualification rather than a preference, and the incentive structure behind expansions like this one is set out in our PLI advanced chemistry cell guide. Madhya Pradesh’s own framework sits in our state policy note.
Sourcing domestically built BESS for a project? Talk to our team, or size the storage economics first.