Skip to content
Alpha Devraj — Energy Storage Systems

Policy & tenders

AmpereHour opens a 5 GWh BESS factory; Havells–Pixii and Amara Raja localise supply — 16 July 2026

On 16 July 2026 the news was supply-side: AmpereHour Energy opened a 5 GWh BESS factory, Havells partnered Pixii and Amara Raja tied up with Nuvation to localise battery-management systems. Serentica's 600 MW/2,400 MWh SECI PPA and Maharashtra's 4 GWh and floating-solar tenders stayed live.

Published 16 July 2026 · Last updated 16 July 2026 · 4 min read · By Alpha Devraj ESS Research Desk

On this page

A short round-up of the India battery-storage headlines our desk tracked on 16 July 2026 — a supply-side day, with a new gigawatt-scale factory and two localisation partnerships taking the lead while the tender calls stay open. For the running list of live opportunities see our tender tracker; for how domestic manufacturing incentives fit in, our PLI ACC battery manufacturing guide.

Manufacturing & supply chain

The story of the day was on the factory floor, not the tender portal. AmpereHour Energy opened a 5 GWh BESS factory, while Havells tied up with Pixii and Amara Raja partnered Nuvation to localise high-voltage battery-management systems — three moves that push more of the value chain onshore. Pace Digitek’s earlier 1.25 GWh first-year milestone stayed in view:

More domestic cell-to-pack and BMS capacity eases the local-content and lead-time pressures that shape how the standalone-BESS tenders below get bid.

Central / PSU tenders & PPAs

The big central deal — Serentica Renewables’ 600 MW / 2,400 MWh solar-plus-storage PPA with SECI for assured peak renewable power — stayed the anchor of the pipeline, alongside NTPC REL’s still-open contractor search for a 300 MW / 1,200 MWh project:

We unpack NTPC REL’s earlier 1,200 MWh calls in our NTPC REL 1,200 MWh tender briefing.

State tenders

Maharashtra’s twin calls remained the state-level focus — its 4 GWh standalone battery bid plus a smaller floating-solar-plus-storage tender:

We walk through the larger call in our Maharashtra 4 GWh BESS tender guide.

Market outlook: C&I storage

On the demand side, two threads ran together: an analysis of why India’s commercial and industrial (C&I) buyers have been slow to adopt storage, set against forecasts that C&I deployments will still exceed 31 GWh by 2032:

For a C&I buyer the takeaway is simpler than the gigawatt-hours suggest: storage increasingly pays back on its own economics — Time-of-Day arbitrage and demand-charge savings — rather than on subsidy, a path that lines up with India’s broader 2032 storage targets.

5Manufacturing3Central / PPAs2State3Market outlook
Count of 16 July 2026 headlines our desk tracked, grouped by theme.

Curious what a domestic-supply-chain BESS or Maharashtra’s tenders mean for your own site? Estimate your numbers with our BESS savings calculator, or talk to our team for a project-specific read.

Let's talk storage

Want these numbers for your site?

Send a bill or a load profile — we model it and tell you straight.