Skip to content
Alpha Devraj — Energy Storage Systems

Policy & tenders

Evren signs a 750 MW solar, wind and battery PPA with NTPC — 4 August 2026

The day to 4 August 2026 was led by a contract rather than a tender: Evren signed a 750 MW power purchase agreement with NTPC covering a combined solar, wind and battery storage project. NTPC separately floated an operations and maintenance tender for a 25 MW floating solar plant.

Published 4 August 2026 · Last updated 4 August 2026 · 1 min read · By Alpha Devraj ESS Research Desk

A round-up of the India storage headlines our desk tracked to 4 August 2026 — a quiet day on the tender side, with the movement happening on signed offtake instead. For the running list of live opportunities see our tender tracker; for the framework behind central procurement, our India BESS policy overview.

Contracted

One large hybrid offtake deal, reported by two outlets:

Three technologies under one contract is the standard answer to an offtaker that wants power on a schedule: solar and wind generate at different times, and the battery closes what is left. That is the hybrid firming logic now behind most of NTPC’s renewable buying, alongside its NVVN and FDRE tender programmes. The headline does not give the battery’s rating, so the storage duration stays unknown.

Also on the desk

An operations and maintenance call for a floating solar plant, with no storage scope attached — noted for completeness rather than as a battery opportunity.

Tender terms and deadlines change by notification — always verify the current bid documents on the issuing organisation’s portal before acting.


Working out what a firmed solar-plus-storage contract means for your own project? Estimate the numbers with our BESS savings calculator, or talk to our team.

Let's talk storage

Want these numbers for your site?

Send a bill or a load profile — we model it and tell you straight.