A domestic manufacturing milestone, tracked alongside our tender coverage.
Pace Digitek BESS output
Output
1.25 GWh
Window
Year 1
Location
India
Over a gigawatt-hour shipped in year one — evidence that Indian BESS assembly is ramping fast, not just being announced.
ESS News ↗What it means
A gigawatt-hour of output in the first year is the supply-side answer to the tender boom: every gigawatt-hour tendered needs cells, packs and integration, and fast-ramping domestic plants like this help close the gap. It joins AmpereHour’s 5 GWh factory and the wider push behind PLI-backed cell manufacturing to localise the BESS supply chain.
Sourcing domestically-built BESS for a project? Talk to our team.