Skip to content
Alpha Devraj — Energy Storage Systems

Policy & tenders

How much BESS capacity has Pace Digitek manufactured?

India's Pace Digitek has manufactured more than 1.25 GWh of battery energy storage capacity in its first year of operation. Reported by ESS News on 9 July 2026, the milestone signals fast-ramping domestic BESS assembly and adds Make-in-India supply just as central and state storage tenders accelerate.

Published 22 July 2026 · Last updated 22 July 2026 · 1 min read · By Alpha Devraj ESS Research Desk

A domestic manufacturing milestone, tracked alongside our tender coverage.

Manufacturing ESS News · 9 Jul 2026

Pace Digitek BESS output

Output

1.25 GWh

Window

Year 1

Location

India

Announced Built Operational

Over a gigawatt-hour shipped in year one — evidence that Indian BESS assembly is ramping fast, not just being announced.

ESS News ↗

What it means

A gigawatt-hour of output in the first year is the supply-side answer to the tender boom: every gigawatt-hour tendered needs cells, packs and integration, and fast-ramping domestic plants like this help close the gap. It joins AmpereHour’s 5 GWh factory and the wider push behind PLI-backed cell manufacturing to localise the BESS supply chain.

Sourcing domestically-built BESS for a project? Talk to our team.

Let's talk storage

Want these numbers for your site?

Send a bill or a load profile — we model it and tell you straight.