A small solar-plus-storage hybrid call, tracked as part of our tender tracker.
Maharashtra floating solar + battery
Solar
59 MW
Battery
59 MWh
Config
Hybrid
A compact hybrid — floating solar with co-located storage to smooth output and shift a slice of generation past sunset.
Mercom India ↗What it means
This is a generation-plus-storage hybrid, not standalone BESS: 59 MW of floating solar with 59 MWh of batteries to firm output and push a portion past sunset. It is a smaller counterpart to Maharashtra’s headline 4 GWh battery tender, showing the state pairing storage with new renewables as well as procuring it on its own — the pattern behind solar-plus-storage solutions.
As of this briefing the tender is open at the bidding stage.
Structuring a solar-plus-storage bid? Talk to our team, or size the storage economics first.