This edition covers the headlines since our 16 November digest. Tenders lead it. Gujarat’s GUVNL has announced the winner of its 1 GW / 4 GWh standalone battery storage auction, a four-hour procurement and one of the largest state awards on our tender tracker. Pace Digitek has also won a 600 MW / 1,800 MWh BESS EPC contract at NTPC Green’s Khavda solar project. No new storage tender was reported today, so the large calls from last week stay the ones to watch.
Major tenders
GUVNL’s auction is the day’s headline. At 4,000 MWh against 1,000 MW it is a four-hour battery, twice the duration of the utility’s earlier 450 MW / 900 MWh auction. The Pace Digitek contract is an EPC award, so NTPC Green keeps ownership and Pace builds the three-hour system. RECPDCL’s West Bengal tender is rooftop solar only and has no storage component.
- GUVNL Announces Winner of 1 GW/4 GWh of Standalone BESS Auction — Mercom India · read our brief
- Pace Digitek secures 600 MW/1,800 MWh BESS EPC contract for NTPC Green’s Khavda Solar Project — pv magazine India · read our brief
- RECPDCL Tenders Rooftop Solar Projects in West Bengal — Mercom India
Still open for bids. Our weekly check for missed large tenders found nothing new beyond these. Each already has a brief:
- NTPC Green Energy tenders 10 GW/40 GWh of battery systems in India — ESS News · read our brief
- SECI tenders 16 GWh BESS — Renewable Watch · read our brief
- NHPC tenders BESS projects at 1.2 GW solar park in India — ESS News · read our brief
- NGEL floats 1 GWh BESS BoS tender in Kerala — Renewable Watch · read our brief
Policy and finance
Delhi’s regulator, DERC, has allowed changes to the bidding rules for a 200 MW firm and dispatchable renewable energy (FDRE) procurement. FDRE contracts usually need storage to meet their supply profile; our FDRE tender framework explainer covers how they work. Abroad, ESS News reports that energy storage is in scope for $10 billion of climate finance targeted by the UK, Norway and Canada.
- DERC Allows Changes in Bidding Rules for 200 MW FDRE Procurement — Mercom India
- Energy storage in scope as UK, Norway and Canada target $10 billion in climate finance — ESS News
Manufacturing
Waaree Energy Storage has started commercial production at a 5.15 GWh battery pack line in Gujarat. KP Group plans a 10 GWh battery cell plant. Renewable Watch confirms that the Ministry of Heavy Industries’ 10 GWh cell manufacturing tender drew 22 bids, as covered in our PLI cell tender brief.
- Waaree Commissions 5.15 GWh Battery Pack Manufacturing Line — Mercom India · also pv magazine India · read our brief
- KP Group plans 10 GWh battery cell manufacturing facility — Renewable Watch · read our brief
- MHI receives 22 bids for 10 GWh ACC manufacturing capacity — Renewable Watch
Tender terms and deadlines can change when a new notification is issued. Before acting, check the current bid documents on the issuing organisation’s portal.
Want to see what a battery could save at your site? Try our BESS savings calculator, or talk to our team for a project-specific estimate.