Skip to content
Alpha Devraj — Energy Storage Systems

Policy & tenders

RRVUNL floats a 250 MW/1,000 MWh grid-forming battery tender; SECI empanels BESS suppliers — 18 November 2026

Rajasthan's state genco RRVUNL has invited bids for 250 MW / 1,000 MWh of standalone battery storage, a four-hour, VGF-backed build-own-operate tender closing on 21 December 2026. SECI has opened an empanelment for battery suppliers, integrators and aggregators, while NTPC Green's 40 GWh and SECI's 16 GWh calls remain open.

Published 18 November 2026 · Last updated 18 November 2026 · 3 min read · By Alpha Devraj ESS Research Desk

On this page

This edition covers the headlines since our 17 November digest. Tenders lead it. Rajasthan’s state genco RRVUNL has invited bids for 250 MW / 1,000 MWh of standalone battery storage, a four-hour, VGF-backed tender that requires every inverter block to run in grid-forming mode. Bids close on 21 December 2026. SECI has also opened an empanelment for battery suppliers, integrators and aggregators. Both join the large calls still open on our tender tracker.

NGEL supply40,580SECI standalone16,000NHPC Jalaun (up to)4,800NGEL Kerala BoS1,000RRVUNL Rajasthan (new)1,000
Battery energy in today's new RRVUNL tender compared with the largest tenders still open for bids (MWh). NGEL's 40.58 GWh supply call still dwarfs everything else in play.

Major tenders

Mercom India’s report gave no capacity, so we checked the trade press. Power Peak Digest and MVA Pulse both put the RRVUNL tender at 250 MW / 1,000 MWh, with a 200 MWh minimum bid and 20% local content. Our brief sets out the terms and flags a lot-size figure to confirm in the RfS. SECI’s empanelment is for vendors, not project developers. Mercom reports that it covers BESS suppliers, integrators and aggregators across capacity tiers for grid-connected deployments, with bids due by 30 November 2026. No capacity was stated, so it has no brief yet.

Still open for bids. Our daily check for missed large tenders found nothing new beyond these. Each already has a brief:

Awards: more coverage

More outlets have now reported yesterday’s two awards. Both were covered in our last edition and have their own briefs.

Market and manufacturing

Havells, the electrical-equipment maker, has unveiled battery energy storage systems, according to pv magazine India. The headline gives no capacity, so it has no brief. ESS News and Renewable Watch have also reported Waaree’s 5.15 GWh battery pack line in Gujarat, which we covered yesterday.

Tender terms and deadlines can change when a new notification is issued. Before acting, check the current bid documents on the issuing organisation’s portal. For the state rules behind today’s lead tender, see our Rajasthan BESS policy guide.


Want to see what a battery could save at your site? Try our BESS savings calculator, or talk to our team for a project-specific estimate.

Let's talk storage

Want these numbers for your site?

Send a bill or a load profile — we model it and tell you straight.